Home > Blog > Content

Working process of wheeled bulldozer

Jan 18, 2025

The working process of wheeled bulldozer mainly includes four processes: shoveling, transporting, unloading and returning. Specifically:

Shoveling process: After the bulldozer arrives at the soil-taking point, it puts down the shovel to cut into the soil and drives forward, and operates the bulldozer to move up and down until the bulldozer is full of soil. At this time, soil will emerge above the bulldozer, indicating that it is full.

Soil-moving process: Immediately after the shoveling process, the bulldozer transports the soil to the designated location.

Unloading process: After arriving at the unloading point, the bulldozer performs the unloading operation.

Returning process: After completing the unloading, the bulldozer returns to the soil-taking point to complete a working cycle.

Send Inquiry