Sbh388 Load 2.5t Backhoe Loader
video
Sbh388 Load 2.5t Backhoe Loader

Sbh388 Load 2.5t Backhoe Loader

Rated Load Capacity: 2.5tons (2500 kg)
Bucket Capacity:1.2 m³
Travel Speed: 36km/h
Operating Weight: 10500kg
Lead Time: 15-20 working days
Supply capacity: 1-500 units/> / year waiting for your order in stock
After-sales Service: Shipping Service, Aftermarket Parts Provide
Send Inquiry
Description

Sbh388 detail

Sbh388 Load 2.5t Backhoe Loader

the Sbh388 is a 2.5-ton class backhoe loader powered by a Yuchai YC4A105Z-T20 forced-induction diesel engine producing 75 kW (around 100 hp). Its front shovel, sized at 1.2 cubic meters, can manage payloads up to 2.5 tons, while the rear digging arm, with a 0.3-cubic-meter bucket, reaches excavation depths of 3.82 meters. Weighing 9–10.5 tons, this all-wheel-drive unit achieves speeds of 38 km/h, enabling efficient movement between worksites. With sturdy construction, precise handling, and consistent performance, it excels in various soil-moving scenarios.

 

 

 

12CBM buket loader

parameter

Type

Backhoe Loader

Operating weight

8200kg

Warranty of core components

1 Year

Moving Type

Wheel

Rated Power

75kw

Load bucket capacity

1 m³

Key Features 

 
Key Performance for Sbh388
shantui backhoe loader

YUCHAI YC4A105Z-T20 75kW engine,

ROPS/FOPS cabin with air conditioning,

Domestic transmission, axle, pump and valve,

Front and rear mechanical operating handles,

Front tire size: 16.9-28, rear tire size: 16.9-28,

One set auxiliary hydraulic pipes & hoses is installed on backhoe arm,

Steer mode: 4-wheel steer, 2-wheel steer, crab steer mode.

Backhoe arm with function of hydraulic side shifting,

H type supporting legs.

 

 

Contact now

WZ30-25 Backhoe Loader Specs Explained

 

Usable scenarios

 

  • Municipal Engineering and Pipeline Construction

This is the core application scenario for backhoe loaders. With its integrated "front-loading, rear-excavating" design, this machine can efficiently excavate trenches for water supply, drainage, gas, and power pipelines in narrow city streets or newly developed areas (rear bucket depth up to 3.82 meters), and immediately use the front bucket for trench backfilling and debris removal. Its 38km/h transfer speed allows for rapid movement between several adjacent work positions, significantly improving the efficiency of municipal emergency repairs.

  • Building Foundations and Site Leveling

In small and medium-sized building construction, factory expansion, or new rural construction, this equipment can undertake light earthwork projects such as building foundation excavation and drainage ramp construction. The front loading bucket's rated lifting capacity of 2.5 tons can easily load and unload sand, bricks, and mixed concrete, while also handling simple leveling of construction access roads and short-distance material transport, replacing the functions of both an excavator and a loader.

  • Agricultural and Irrigation Facility Upgrades

For operational scenarios such as the final stage of farmland irrigation systems, livestock farm expansion, and land leveling in fruit and vegetable planting bases, this machine is more flexible than large excavators and more efficient than mini excavators. The 0.3 cubic meter backhoe bucket can excavate irrigation and drainage ditches and repair field ridges and slopes; the 1.2 cubic meter bucket is suitable for loading fertilizer, feed, harvested crops, or cleaning livestock manure, making it a versatile tool in modern agricultural mechanization.

Contact now

Our company

WZ30-25 Backhoe Loader Advantages

Contact now

How the WZ30-25 Improves Job Efficiency

WZ30-25 Backhoe Loader Buying Guide

FAQ

Q: Is the maximum excavation depth of 3.82 meters sufficient for sloping pipe trenches or deep foundation pits? How to handle ultra-deep working conditions?

A: • Layered excavation method: First, excavate the upper layer of soil along the edge of the trench to a depth of 2.5 meters. Then, retract the equipment to the second step and continue excavating downwards. The total depth can reach over 5 meters.

• Extended boom: Contact the Shanmeng Attachments department to customize an extended excavator boom (hydraulic system flow rate needs to be confirmed). This can extend the depth to 4.5 meters, at the cost of reducing the bucket capacity to 0.2 m³.

Q: The front bucket has a rated load capacity of 2.5 tons, but the 1.2 m³ standard bucket is often overloaded when loaded with wet clay or gravel. How to avoid frequent overloading?

A:

• Bucket Capacity Optimization: It is recommended to configure a 0.9m³ "rock bucket" or a 1.0m³ "light material bucket" to strictly control the full bucket weight to within 2.5 tons, protecting the lifting cylinder and chassis.

• Load Indicator Installation: Install an electronic bucket scale in the aftermarket, displaying the load in real time in the cab, with an audible and visual alarm when the load approaches 2.3 tons.

Q: The YC4A105Z-T20 engine meets the National II emission standard. How can it be used compliantly in areas with strict environmental inspections?

A: •After-treatment Modification: Install a DOC+DPF diesel exhaust purification device (requires authorization from Shanmeng or Yuchai), which can reduce particulate matter emissions by more than 90% and pass smoke opacity tests. • Equipment Replacement Strategy: If operating in key environmental control areas for an extended period, it is recommended to apply for the "Old Machine for New Machine" subsidy from the Mountain Alliance to replace the old machine with a National IV emission standard 388H model.

Hot Tags: sbh388 load 2.5t backhoe loader, China sbh388 load 2.5t backhoe loader manufacturers, suppliers, factory, tractor front loader and backhoe, tractor with front end loader and backhoe, tractor front end loader backhoe, backhoe loader working, backhoe tractor loader, used compact tractor loader backhoe

Send Inquiry

(0/10)

clearall